Over the years, MetroMac has established itself as a leader in providing turnkey solutions to the Oil and Gas sector. Turnkey deployments for Electrical & Instrumentation solutions for projects, Revamping / Upgrading of Control Systems consisting of:
- Basic Engineering
- Detailed Engineering
- Procurement
- Installation
- Pre Commissioning & Commissioning
- Preparation of As Built Drawing
A few project summaries include:
MetroMac executed the installation and pre-commissioning for the barges that were built for Kazakhstan´s Kashagan offshore oil-field projects. Click here.
Metro Mac carried out the pre-commissioning test for the installation of the GOLFINO module, which is a part of the FPSO CIDADE DE VITORIA Vessel. Metro Mac carried out the pre-commissioning tests for these installations.Click here.
Metro Mac undertook the pre-commissioning test for the installation of the FPSO FRADE-
an international turret that can accommodate 33 risers, with the topsides capacity for the production
of 100,000 barrels of oil treatment and compression of 106 million standard cubic feet of gas, and
treatment and injection of 150,000 barrels of water per day. Click here.
The Talisman required a 55-person accommodation in MOPU STOR including bedrooms with
adjacent bathrooms, luxury gallery, dining room and lounges, hospital facility and more. Metro Mac took up the pre-commissioning activity along with the Electrical and Instrumentation scope of work. Click here.
Metro Mac carried out the up gradation of the Diesel Fire Water Pump to the Siemens S7-315 PLC
module with SIL-1 rating for control logic and annunciator. Click here. |