EPC FOR ELECTRICAL AND INSTRUMENTATION WORK FOR THE POLYPROPYLENE-5 (PP5) PROJECT
Our Role
E & I Subcontractor
End User
BOROUGE
Job Carried Out
Calibration, Installation, Pre-commissioning of Electrical & Instrumentation.
Metromac is executing Electrical and Instrumentation Works in Abu Dhabi Polymers Company LTD (Borouge), Ruwais under M/s NSH. The Engineering Contractor was Maire Tecnimont S.P.A / Nasser Al- Hajri Corporation
Transformer Oil Filing, Oil Treatment & Transformer Testing
Connection of Medium Voltage Cables (with Raychem Kit) including construction and recommissioning tests
Inspection and Testing of MV and LV Switchgear, MV Motors, LV Bus ducts, Local Heat Tracing Distribution Panels
Installation of Main Switchgears (MV & LV) and MCCs
Instrument Installation, Loop checking, and Calibration services
Installation of Cable Trays, Conduits with required Supports, Cable laying Glanding, and Termination
Preparation and submission of Inspection and Test report against the installation works and acceptance from the Client
Commissioning Assistance