DXB AIRPORT EXPANSION PHASE 3 (CARGO MEGA TERMINAL), UPGRADE AND EXPANSION OF MATERIAL HANDLING SYSTEM

DXB AIRPORT EXPANSION PHASE 3 (CARGO MEGA TERMINAL), UPGRADE AND EXPANSION OF MATERIAL HANDLING SYSTEM

Project Overview

Our Role

E & I Sub Contractor

End User

Dubai International Airport

Job Carried Out

Installation, Pre-commissioning & Commissioning for Electrical & Instrumentation

Project Description

Metromac as a subcontractor for Siemens has executed the scope with site establishment, complete electrical installation, and functional testing, and recommissioned the material handling system of the Cargo Handling System. The engineering contractor is Siemens.

Scope of Work
  • PLC Panel (Siemens), Operator Station-Ray control, Scanner Control, SMDBs, and Fire Shutter Panels

  • Erection of ASRS, LSP, Truck Dock, Transfer Car, Transfer Vehicle, QDT, and ULD Systems

  • Installation of Cable Tray, Flexible & rigid Conduit, and Supports

  • Energy Chain Installation, Profibus, Profinet, and Fiber-optic Networking.

  • Power and Control Cable laying, landing, and Termination

  • Electrical Installation, Wiring, and Hardware check (Pre-Commissioning) of all electrical field equipment with the necessary assistance to Siemens including fault Correction.

  • Loop checking and Pre-commissioning