Project Description
In DRP-1&2, the existing cabling has withered and system had to replaced with new cable management and cabling systems.
Scope of Work
Metromac was awarded the job to carry out the complete scope including the engineering, procurement, construction and commissioning.
The Plant areas in DRP-1 involved was Waste Treatment Plant(WTP), 22kV Substations(SS), Air Suppressor Plant (ASP), Reformer, Material Handling (MH) Areas.
The Plant areas in DRP-2 involved was Reformer, 22kV Substations(SS), PGH, Cooling Tower, Reactor Tower.