The project was to set up 02 Nos. of Crude Processing Units (CPU1 & CPU2) inside of the VTTI Fujairah Terminal. All the Equipment, Instruments, and Materials were provided by M/s BURANDO and Metromac has carried out the complete construction for the E&I works including the final Documentation. The Engineering Contractor is BURANDO.
Installation of all Instruments & it's tubing
Laying of all-new Power, Control, and Signal Cables
Cable Glanding & Termination, Installation of Light Fixtures
Installation of Gas/Flame Detectors and FM200 System
Electrical Cable Laying and Termination Activities for the HVAC Units & New Transformer
Removal of existing transformer and Supply with Installation of New Transformer (200KVA)
Installation of LT panels for Primary and Secondary along with Transformer.
Commissioning the Transformer