Project: GOLFINO Module
End User: SAIPEM
Job Carried out: Installation, Pre-commissioning of Electrical & Instrumentation
3 gas turbo generators and one steam turbo generator are included in this vessel. Crude storage capacity is 1,900,000 bbls and Slop tanks capacity is 110,000 bbls
Metro Mac worked as a sub-contractor in Lamprell to carry out Erection, cable laying, glanding and termination of all panels in LER, Instrument Room and Transformers in Transformer room and Batteries in Battery room. Installation of F & G instruments, PA/GA instruments and its cable laying, glanding, termination and calibration.
Installation of Instrument tubing jobs which includes high pressure lines & hydraulic lines to about ½” inch SS tubes.
After the construction Metro Mac carried out the pre-commissioning test for these installations. The construction activities were carried out at Dry Docks World- Dubai.