BROWIN GAMMA – INSTRUMENTATION WORKS PROJECT

BROWIN GAMMA – INSTRUMENTATION WORKS PROJECT

Project Overview

Our Role

E & I Sub Contractor

End User

TENNET

Job Carried Out

Installation, Pre-commissioning & Commissioning for Instrumentation

Engineering Contractor

Petrofac / Siemens

Project Description

This Project was the Fabrication and Construction of the Topside carried out by Petrofac, in consortium with Siemens for TENNET. The platform will house a Siemens 900 megawatt HVDC station that will convert the alternating current produced by the wind turbines to direct current. Metromac scope of work is including but is not limited to Installation testing and commissioning of the following:

Scope of Work
  • Fabrication and Installation of Cable trays/ladders

  • Installation of Instruments, Tubing for the instruments

  • Laying of all Control and Signal Cables

  • Panel Modifications & Internal Wirings

  • Installation of Junction Boxes, Cable Glanding & Termination

  • Installation of Gas/Flame Detectors

  • Electrical Cable Laying and Termination Activities

  • Cold Loop Check and Hot Loop Check

  • Pre-commissioning and Commissioning Activities