GOLFINO MODULE 51

GOLFINO MODULE 51

Project Overview

Our Role

E&I Sub Contractors

End User

SAIPEM

Job Carried Out

Installation, Pre-commissioning of Electrical & Instrumentation

Project Description

GOLPHINHO Module 51 is a part of Vessel FPSO CIDADE DE VITORIA. Metro Mac worked as a sub-contractor in Lamprell. The construction activities were carried out at Dry Docks World- Dubai.

Scope of Work
  • Carried out erections, cable laying, glanding and termination of all panels in LER, Instrument Room and Transformers in Transformer room and Batteries in the Battery room.

  • Installation of F & G instruments, PA/GA instruments and their cable laying, glanding, termination and calibration.

  • Installation of Instrument tubing jobs which includes high-pressure lines & hydraulic lines to about ½" inch SS tubes.

  • Carried out pre-commissioning test after the construction test for these installations.